ARAD workshop technicians assembling air grilles

At the ARAD workshop, a section of duct passes through several hands before it disappears above a ceiling. An engineer locates it on the drawing, a fabricator marks its dimensions on the sheet, and the site crew works out how to lift it into place. Follow that journey through the HVAC work behind interiors in Dubai, Sharjah and Abu Dhabi.

Workshop

From duct selection to installation

Pre-insulated foam panel sample from Pearl Industries

PI duct · pre-insulated foam panels

The first dimension on a PI duct drawing is the clear opening for air. On the cutting bench, the panel has a thickness of its own. The technician marks the inside face first, then lays out the bends of the transition. Once folded, the two openings can be checked against the equipment connection before the section goes to site.

PI means pre-insulated. The rigid foam core forms part of the duct wall itself. Phenolic and PIR panels are examples of different systems. The specified panel determines the joint treatment and fittings, so the material reference travels with the cutting schedule.

Pearl Industries
Sheet folding at the ARAD workshop

GI duct · galvanised steel ventilation ductwork

An offset has to connect two openings at different heights. In the workshop it starts as several flat faces of galvanised steel. The fabricator marks the fold lines and seam allowances, then checks the orientation from the inlet. Turning a pattern over on the bench can send the finished outlet in the opposite direction.

GI is the trade abbreviation for galvanised iron. In HVAC ductwork it commonly describes zinc-coated steel sheet. On a supply or return run, the dimensions, pressure class and joint detail in the specification guide fabrication. The section label connects the finished piece to the right branch on site.

MS exhaust · a cleanable kitchen extract route

Follow a restaurant hood towards the discharge point. At the first bend, the drawing has to answer a second question: how will a maintenance technician reach the inside after the ceiling is closed? A cleaning door that opens freely on the bench still needs clear space below it on site.

MS means mild steel. For a commercial kitchen grease exhaust system specified in welded steel, the continuity of the joints and the location of cleanouts are part of the same fabrication brief. The workshop detail follows the approved project design, including how that section will be inspected before it is enclosed.

Duct installation · from the delivery truck to the ceiling

The first piece to go up is sometimes the one furthest from the door. Before unloading, the site crew traces the route through the service corridor and checks whether the largest section can turn at the corner. That decision sets the delivery order and where the sections are laid down.

Above the ceiling, the installers compare opening levels and support positions with the coordinated drawings. Once the sections are joined, the engineer can follow the route from unit to terminal, check service access and identify the outlets for airflow measurements. That sequence ties workshop fabrication to the finished room.

Central air conditioning and chilled water

We supply Carrier and General air-conditioning equipment to the project schedule. For central air conditioning, equipment selection sets the discharge position and service clearances. On chilled-water systems, the coil connections and condensate drain share ceiling space with the duct that carries air to the room.

Where central air conditioning meets the ceiling grilleAir-conditioning display units outside the ARAD showroom
Carrier

For a Carrier equipment selection, coordination starts with the unit schedule. The discharge orientation shapes the first connection between equipment and duct.

GENERAL

GENERAL appears on the workshop sign and on a display unit. When setting out an indoor unit, the team checks the filter withdrawal space before the ceiling layout is finalised.

Midea

Midea is visible on the sign and the outdoor display unit. Setting out an outdoor unit means allowing for the heat exchanger and a service route as well as its footprint.

Technical office

Technical office

The engineers work back from the site opening. Internal dimensions, offsets and joint positions are marked on the shop drawing before a sheet reaches the cutting table.

Read the story
Fabrication floor

Fabrication floor

The cutting table turns a flat pattern into the faces of a duct. For galvanised iron (GI) ventilation ducts, the pattern includes material for folds and seams. Black iron (BI) exhaust sections follow the material and joint details specified for the job.

Read the story
Sheet-metal forming

GI Ductwork · The First Fold

At the folding machine, the technician lines up the bend with the mark on the sheet. A small change here can move the outlet of an elbow away from its intended position.

Read the story
Press operation

At the Press · Checking the First Piece

The press forms repeatable profiles. The first piece is checked against the drawing before the operator continues with matching pieces.

Read the story
Duct section assembly

Duct section assembly

On the assembly bench, fabricators bring the sides together and check the diagonals. For a BI kitchen exhaust run, they also check the position of the cleaning access before the section leaves the bench.

Read the story
Air terminal assembly

Air terminal assembly

At the grille, the duct meets the finished ceiling. The team checks the frame and the connecting neck against the opening. Where the project calls for air-conditioning equipment, we supply Carrier and General units to the project schedule.

Read the story
Service fleet

Service fleet

The fleet carries the finished sections to site. Loading follows the installation sequence so the first piece the installers need is within reach.

Read the story