Why HAP zone peaks do not simply add up
A zone report and a system report can show different peak values without either report being wrong. One question asks when an individual zone peaks. Another asks what several zones require at the same time. Read the hour and the load category beside each result.

Compare two hours
Consider two illustrative sensible loads. At 10 am an east zone needs 8 kW and a west zone 3 kW, giving 11 kW together. At 4 pm they need 4 and 9 kW, giving 13 kW together. Adding each zone’s separate maximum gives 17 kW, a condition that did not occur at either illustrated hour.
Read like-for-like report lines
A room sensible load cannot be compared directly with a total coil load that also includes moisture removal and system effects. Identify the equipment boundary, units, month and hour before comparing the numbers. Two example hours explain coincidence but cannot identify the actual annual maximum.
What should appear in a design review?
Present the zone peaks, the coincident system peak and the assumptions that connect them. If a reviewer proposes a diversity allowance, establish whether time diversity is already represented in the model before applying another adjustment.
Read the time stamp aloud
During a design review, ask one person to read out the zone name, hour and load type while another locates the corresponding system line. This simple check catches comparisons between room sensible demand and total plant demand. It also makes the coincidence example easy to explain to an owner: the east-facing and west-facing rooms share equipment, but their highest demands need not arrive together. Record both the zone-level and equipment-level decisions.