Office and restaurant fit-out cost in Dubai
Dubai · Project budgets · FP Group
A useful Dubai fit-out budget starts with the condition of the unit. Compare the same measured floor area, specification and exclusions before using any contractor’s rate per square foot.
How to compare a 2026 Dubai fit-out cost per square foot
Divide the quoted amount by the area actually covered by that quote. As an arithmetic example, AED 600,000 for 3,000 sq ft gives AED 200 per sq ft. That figure describes the example only. Before comparing it with another tender, align the area basis, date, equipment allowances, landlord charges, tax treatment and exclusions. A kitchen equipment package alone can change which offer appears cheaper.
How much should you allow per square foot?
In its 2026 Dubai construction guide, Monde gives AED 165–260 per sq ft for a Category B office and AED 350–700 per sq ft for food and beverage fit-out including a kitchen. These are one contractor’s published benchmarks. Authority fees, landlord charges and VAT are additional. Confirm the equipment schedule and existing building services separately before adopting either figure.
What changes the restaurant budget?
A tenant taking over a fitted office may reuse partitions and air distribution. A restaurant operator taking the same floor area needs to establish whether extraction, drainage and the electrical supply suit the actual menu. Ask bidders to price alterations to the base building separately and identify who supplies cooking equipment, furniture and signage.
A worked budget for 2,000 sq ft
At the published office rates, the illustrative construction allowance is AED 330,000–520,000. At the restaurant rates it is AED 700,000–1.4 million. These figures are arithmetic examples. Before signing a lease, obtain a measured survey and a scope that separates build cost, professional fees, equipment and contingency.
Sources
Dubai construction benchmarks and exclusions

