Commercial Kitchen Fit-Out in the UAE: Ventilation, Grease Traps, and Civil Defence Rules

FP Archive · UAE

Commercial kitchen ventilation and exhaust in the UAE should be investigated before a restaurant lease is signed. Start with the menu, equipment schedule, landlord’s available routes and the emirate’s review process. A unit suited to coffee service may have very different constraints from one intended for grilling.

What to prepare for a Dubai restaurant kitchen ventilation review

Start with an equipment schedule showing the cooking process at each station. Ask the appointed engineer to trace extraction and replacement air from the kitchen to the building connections and identify any landlord restrictions. Keep the equipment plan, duct route and outstanding landlord or Civil Defence queries on the same revision register so that changes to a cooking line reach every reviewer.

restaurant and café fit-out

Follow air from appliance to discharge

Ask the kitchen and mechanical designers to draw the cooking line, capture equipment, replacement air and complete exhaust route together. Show where filters and ducts will be accessed for cleaning. Verify the proposed discharge location with the landlord and relevant authority before committing to equipment. An available shaft on a letting plan is only the start of that investigation.

Keep drainage and grease access on the plan

Locate the grease interceptor proposed by the plumbing designer and trace the maintenance route to it. Consider how it will be serviced during operation and where waste can be removed. Dubai Municipality publishes guidance for kitchen safety and accessible grease filters. For another emirate, confirm the local food authority and applicable requirements for that site.

Coordinate fire review and opening checks

Have the fire consultant establish the applicable Civil Defence route and review the equipment, fuel, hood protection and interfaces for the actual design. Include access for inspection and arrange the required tests with the appointed specialists. At handover, ask the operator to demonstrate shutdown, cleaning access and the maintenance log using the installed equipment.